mirror of
https://github.com/garrytan/gbrain.git
synced 2026-08-14 08:53:22 +00:00
Adversarial review: survived a hostile reviewer plus two independent refuters, each told to assume the PR was broken and to default to refuting when uncertain. 19 of 62 PRs cleared that bar. Transcripts-first work ordering permanently starved the doctor-visible page backlog whenever the budget cap bit — the pages never got reached. Page-first interleave at the single merge point, with spend proven order-independent, and stubbing the old ordering back fails 4 of 5 tests. Landing first among the extract-atoms.ts PRs, so #3691 and #3654 rebase onto it. Verified before merge: the PR's own tests fail when the production change is reverted; typecheck clean; MERGEABLE/CLEAN on the current base after batch 1 landed, not a stale one. Known gap, recorded rather than hidden: no real-LLM budget run; the identical error path was driven synthetically.